The common-property defect register the inspector actually wants.
Log every common-property defect by unit and level with a dated photo, give owners a portal instead of your phone number, and hand the inspector, the insurer or the tribunal a register that already exists. Built for strata managers, building managers and the committee that inherits the building.
A note in the minutes is not a record.
“Lobby leak, to be actioned” means nothing to a lawyer eighteen months from now. Neither does a photo in one committee member’s camera roll. Raised properly means the defect exists as one thing: captured where it happened, with the photo and its capture time attached, the location it belongs to, and the responsibility written down. Then the lifecycle does the rest: issued, disputed if the builder wants to, fixed with a photo, closed by someone allowed to close it.
We wrote up the lobby-leak version of this in the paper trail strata can produce; the short version is that the party without one eats the cost.
- Raised where it happenedStanding in the lobby, in the carpark, on the roof: a photo, the location it belongs to, a description, in about two taps. Not typed up from the minutes a week later.
- A capture time nobody can argue withThe photo keeps its original device timestamp and who took it. It proves the leak existed in that lobby on that date. The builder can argue the cause; they cannot argue it away.
- Common property or lot, by typeEvery location is tagged Apartment or Common area, so “everything on common property still open” is a filter, not a meeting.
- Assigned, with a due dateIssue it to the builder, the plumber or the fire contractor. They get a link in an email, attend, and cannot mark it complete without a photo of the finished work.
- Closed by the right personA trade marks work complete; a manager or building manager closes it. Every transition carries a name, a role and a time, and nobody edits the history.
- Disputes on the recordWhen the builder says it is condensation, they say so on the defect. It pauses, someone adjudicates, and both the claim and the ruling stay on the file.
A portal instead of a phone queue.
Residents get in three ways, and none of them is a password they will forget: a printed QR card handed over at settlement, the location code on the door, or an account a manager sets up. Whichever way, they raise the fault with a photo and watch it move. Nothing a stranger types in a lobby goes live until a manager approves it. The full model is in trades, tenants and clients, and the portal itself is described on the portals page.
The committee is different from the residents. Set committee members up as clients and they see the whole building read-only, comment where they need to, and pull their own Client Defect Summary before the meeting rather than asking you for one.
- A QR card, not a passwordHand each resident a printed card at handover. Scanning it logs them into their own portal. No app to install, nothing to remember.
- They raise it with a photoThe resident describes the fault, attaches the photo, and it lands in the register already filed against their lot or the common area they scanned.
- They watch it moveStatus changes and the close-out photo show in the portal. The phone call to the managing agent stops being the only way to find out.
- Costs and contractors hiddenResidents see their own items with cost figures and contractor identity stripped out. The committee sees the whole building, read-only, through the Client role.
- Nothing live until approvedA stranger who scans a code in the lobby gets a short form and a pending request. A manager approves it, corrects the lot number if they typed it wrong, or denies it and the card dies.
- The AGM pack is an exportA Summary PDF of what is open on common property, a Client Defect Summary for the committee, a Defects Export for the auditor. Filter first, see the count, then generate.
The tree keeps them apart, so you don’t have to.
A strata building is the shape IssuesId’s location tree was drawn for: a building, its levels, the lots on each level, the rooms in each lot, and the lobby, plant room, carpark and roof beside them. Every location is tagged Apartment or Common area, and that tag runs through everything: which list a scanned code opens, which defects a resident can see, which rows the Quality Control report groups together. The residential tower template builds the whole tree from a few numbers at setup, and a CSV import handles the odd-shaped one.
The practical result: “show me everything still open on common property, issued to the builder, raised before the interim inspection” is three filters and a match count, with a QR label on the plant-room door that opens exactly that room’s list for whoever is standing in front of it.
What the inspector asks for, and where it is.
Every new building has a window in which defects are the builder’s to fix, and it closes. In New South Wales the strata building bond scheme adds an independent inspector who reports on common-property defects twice inside the first two years, and the bond the developer lodged is what pays for whatever the builder will not. Other states run the statutory warranty without the bond. In every case the committee that gets its money’s worth is the one running the window like the clock it is: a live list of every common-property defect, each one logged, photographed, assigned and tracked to close-out, so that when the builder stalls you can show exactly what was raised and when.
The same register keeps working after the clock stops. The lift fault in year six, the fire-door audit finding, the render lifting off the north face: raised, assigned to the contractor, closed on a photo, and readable by the next manager and the next committee. The building keeps one history. The people who raised it do not have to.
Questions strata managers ask first
Ready to stop reconstructing the paper trail?
Residents, committee members, contractors and the managing agent all log in at the same place, and each sees only what their role allows. Pricing is per building, not per owner. If the builder is still on site, the builder’s own handover record and this register are the same product, so the handover is a change of role rather than a change of system. For what a record needs to carry when it ends up in front of a tribunal, read what makes a defect record stand up in a dispute.