A construction deficiency list template, with the columns explained.
Eighteen columns, four worked deficiencies from one floor of a fit-out, and one line on why each column is there. The same discipline as a punch list, with the spec section and the back-check on the sheet. Download it, copy it into a sheet, or read where a deficiency list breaks. No form, no email.
| No. | Building | Level | Location | Deficiency | Spec section | Trade | Subcontractor | Photo | Priority | Identified by | Date identified | Due | Status | Completed on | Back-checked by | Closed on | Notes |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| D-0412 | A | 7 | Suite 702, conference room | Drywall nail pops, north wall, 6 locations, visible under raking light | 09 29 00 | Drywall | Northline Interiors | IMG_2041.jpg | Standard | M. Alvarez (super) | 2026-09-14 | 2026-09-25 | Closed | 2026-09-23 | M. Alvarez (super) | 2026-09-24 | Back-checked against original photo; all 6 spotted and painted. |
| D-0413 | A | 7 | Corridor 7B, stair 2 door | Fire-rated door does not self-close and latch from 90°; closer arm loose | 08 71 00 | Doors and hardware | Keystone Door & Hardware | IMG_2043.jpg | Life safety | M. Alvarez (super) | 2026-09-14 | 2026-09-14 | Closed | 2026-09-14 | R. Chen (QA) | 2026-09-14 | Closer re-fixed same day; latching confirmed three times. |
| D-0414 | A | 7 | Suite 704, open office, grid C/4 | Supply diffuser not connected; flex duct lying on ceiling tile | 23 37 13 | Mechanical | Summit Mechanical | IMG_2047.jpg | High | J. Patel (architect field rep) | 2026-09-15 | 2026-09-17 | Ready for back-check | 2026-09-17 | — | — | Ceiling tile at C/4 to be replaced by ACT sub after. |
| D-0415 | A | 7 | Suite 702, kitchenette | Base cabinet door misaligned; 1/8 in proud of adjacent door | 06 41 00 | Millwork | Cedar Ridge Millwork | IMG_2050.jpg | Standard | J. Patel (architect field rep) | 2026-09-15 | 2026-09-26 | Disputed | — | — | — | Sub says hinge damaged by tenant move-in; photo from 15 Sep predates move-in. Re-issued. |
What each column is for
A deficiency list does two jobs: it gets each item to the sub who owns it, and it proves each item was back-checked before it closed. The first ten columns do the first job; the last eight do the second, and they are the ones a walk sheet usually leaves out.
- 01No.
- A permanent number, assigned once and never reused. It does not encode the floor, the room or the sub, because all three can change and the number must not.
- 02Building
- The building or phase, for a campus, a multi-building job or a site with a parking structure. One column, so a filter for Building B returns Building B.
- 03Level
- Floor or level, as its own column.
- 04Location
- Suite, room or gridline, from an agreed list. “Suite 702, conference room” or “Grid C/4” is a location; “by the elevators” is not.
- 05Deficiency
- What is wrong, where on the thing it is wrong, and how much of it. “Drywall nail pops, north wall, 6 locations” beats “drywall”.
- 06Spec section
- The specification section or drawing the work falls short of, where one applies. It turns “I don’t like it” into “it doesn’t match 09 29 00”, and it is the first thing a disputed item is argued from.
- 07Trade
- The scope the work belongs to: drywall, doors and hardware, mechanical.
- 08Subcontractor
- The company responsible. Separate from Trade, because one sub can carry several scopes and one scope can be split between subs.
- 09Photo
- The filename of the photo taken when the deficiency was found. The photo is the deficiency; the row is where it is filed.
- 10Priority
- Life safety, High or Standard. Life safety is today; High is inside two working days; Standard follows the turnover date.
- 11Identified by
- Who found it: the super, the architect’s field rep, the owner’s rep. Each walks differently and the reader needs to know whose this is.
- 12Date identified
- The date it was found. Not the date it was entered.
- 13Due
- The fix-by date, set when the item is issued to the sub and visible to them.
- 14Status
- Open, Issued, In progress, Ready for back-check, Closed or Disputed. Give each status a named owner who is allowed to move it; the sub moves a row as far as Ready for back-check.
- 15Completed on
- The date the sub said it was done, with their photo. Their claim, kept apart from the close-out.
- 16Back-checked by
- Who checked the fix against the original photo, on your side.
- 17Closed on
- The date back-checked and closed.
- 18Notes
- Anything else: the dispute, the re-issue, the access arrangement with the tenant. Never a substitute for the columns.
Four deficiencies from level 7
D-0412, the nail pops. Six locations on one wall, so one row with a count rather than six rows. Standard priority, issued against the turnover date. The sub marked it complete with a photo; the super back-checked against the original and closed it the next day. Every column filled, which is what a closed row should look like.
D-0413, the stair door. Life safety: a fire-rated door that does not close and latch is today, not this week. Issued at 9, fixed by noon, back-checked by someone other than the super who raised it. One row, one day.
D-0414, the diffuser. High, because the suite cannot turn over with no supply air at C/4. The sub has said it is done and the status says Ready for back-check, which is exactly where it should sit until someone on your side has looked. The note tells the ceiling sub what follows.
D-0415, the cabinet door. Disputed: the sub says the tenant’s movers did it. The photo is dated the 15th and move-in was the 18th, so the row was re-issued with a note that says why. This is the row the Photo and Date identified columns exist for.
Where a deficiency list breaks
A deficiency list in a spreadsheet works for one walker, one floor and a couple of weeks. It breaks in three predictable ways, and all three arrive in the run-up to substantial completion and turnover.
Questions about the deficiency list
Keep the columns. Give them one home.
Whatever holds this list should give you one copy, the photo attached to the row rather than named in it, the sub’s claim kept separate from the back-check, and a Closed that only your side can set. If the sheet is doing that, keep it.
When it stops, defect management software covers what a system has to do with the same columns, and the docs explain how IssuesId runs the lifecycle, the sub’s no-login link and proof photo and who can close what. The words are in the glossary under deficiency and punch list, and the same list in British and Australian English is the snag list template.