Snag and snag list
A snag is a minor defect or unfinished detail found at or near completion, and a snag list is the list of them walked up before handover. Snagging is the act of walking the building to find them.
British and Irish, and common in Australia and New Zealand for the pre-handover list. The United States calls the same list a punch list. In contracts the items on it are still defects.
Snagging happens in the last weeks: a room-by-room walk, a list of everything short of finished, each item issued to a trade and chased before the client walks the same rooms. The snag list fails when it lives on paper or in a group chat, because the photo, the room and the trade drift apart.
How IssuesId holds it
IssuesId runs snagging as a defect register with a short capture flow: photo, room from the location tree or a QR label, trade, due date. Snags are issued by email with a no-login link, marked complete only with a photo of the finished work, and closed by someone on your side. The Door Sheet report prints one page per room for the walk.
Two questions people ask
Definitions describe common usage and the usual shape of standard-form contracts. Your contract and your jurisdiction’s building law set the terms that apply to your job. The whole list is at the glossary.