Changelog
Always shipping, never surprises.
What we’ve improved across the app, newest first.
6 July 2026
NEW- →Colour-coded defect lists — rows tinted by status with a matching legend, plus multiline descriptions and per-user customisable columns
- →Tenants can now be onboarded by scanning an admin-provided QR code
- →Defect photos can be embedded directly in the assignment notification email, and photo capture dates are editable
- →Choose your own landing page after login, and confirm-with-undo when removing an assignee
22 June 2026
NEW- →New report types — defect-type breakdown, month-by-month line graph, and Excel (xlsx) exports
- →Email a report to recipients straight after generating it
- →Raise a defect notification as a single PDF or a photo ZIP and send it on
- →Set a project coordinator with signature, and customise the status labels shown across the app
- →Summary reports can now include defect photos
14 June 2026
NEW- →Scan drawings to automatically suggest a location structure, then review, edit and confirm before it is created
- →Re-scan drawings and add more drawings to an existing scan session
10 June 2026
IMPROVED- →Redesigned sign-up, login, email-verification and onboarding screens
- →Added forgot-password and reset-password recovery
- →Refreshed app theme and typography
9 June 2026
NEW- →New sign-off workflow — request and record approvals on assignments, with configurable approver roles and history
- →Get notified when you’re @mentioned in a defect note
- →Password-reset emails, plus a cleaner redesigned look across all system emails and weekly digests
- →Every organisation now starts with a set of default project types
2 June 2026
NEW- →Import your existing projects, locations, defects, contractors and photos from your previous system, with live ongoing sync
- →Redesigned Projects list with per-project health, and a redesigned single-defect view
- →Managers now see and access all projects in their organisation
- →Redesigned Locations view — touch-first tree with a mobile layout
- →Each defect now shows a stable defect number, and photo annotation uses the full drawing markup editor
16 May 2026
NEW- →Full mobile redesign — mobile-first defect capture, lists, detail views and dashboards
- →Annotate photos with pins and add voice-dictated captions, including while offline
- →Drawing revision history — upload new revisions, compare them and set the current one
- →Defect sub-types plus new defect types for finer categorisation
- →New defect fields — “Cost To” and “In Progress” date — with more filters and CSV columns
- →Mobile drawing markup with pinch-zoom and pan
8 May 2026
NEW- →Bulk actions on defects — change status, assignee or reporter, or delete many at once
- →Track who raised each defect, and set a type per assignment
- →New “In Dispute” status flows through dashboards, digests and reports
- →More advanced defect filters, including date ranges and reporter
3 May 2026
NEW- →New read-only Client role with its own dashboard, defect view and weekly summaries
- →Configurable notification workflows and editable email templates per project
- →Email activity log — see which notifications were sent, and resend if needed
- →Invite clients to a project by email
27 April 2026
IMPROVED- →Defects now show their full location breadcrumb on lists and detail
- →Inline-edit assignments and send an optional notification when issuing a defect
- →More defect filters (type, raised by, cost attribute, due/closed date ranges) with click-through from dashboard charts
- →Set notification email recipients and manage drawings per project
25 April 2026
NEW- →QR location codes — generate printable sheets and scan a code to jump straight to a location or raise a defect there
- →New Document Register with revisions, and distributions with acknowledgement tracking and transmittal PDFs
- →Bulk-upload documents and link them to defects
- →Clearer “Assignee” labelling across defects, work orders and navigation
18 April 2026
NEW- →Role-based access across the app — each role now sees only the projects, actions and navigation relevant to them
- →New Building Manager role and per-project building-manager configuration
- →Tenants get a conversation thread on their defects with controlled visibility
- →Trades are limited to the actions appropriate to their role
14 April 2026
NEW- →New Work Orders — raise from a defect, add line items, track approval and export to PDF/CSV
- →Self-service sign-up with email verification
- →Join an organisation via an invite link or QR code, with a guided setup wizard for new orgs
- →Sign in by scanning a QR code, with “remember me” and active-session management
- →Assign defects with cost attribution
4 April 2026
NEW- →New notification centre with All/Unread tabs, unread badge and mark-all-as-read
- →Choose which notifications you receive on each channel
- →Push notifications, including an install guide for iOS
- →Branded, better-looking notification and digest emails
30 March 2026
NEW- →Full organisation member management — invite users, set roles, and accept invites with auto-login
- →New profile page to update your details and change your password
- →Organisation settings with logo and colour branding, applied across the app
- →Redesigned dashboard KPI cards
27 March 2026
NEW- →New contractor detail page showing company info, contacts, assigned projects and defect history
- →Merge duplicate contractors
- →Add notes to contractors, and export the contractor list to CSV
- →Contractor names now link through to their detail page from lists and search
26 March 2026
NEW- →New app-wide search / command palette to jump to any project, defect or contractor
- →Dark mode with a light/dark/system toggle, plus switchable colour themes
- →New sidebar navigation that remembers its collapsed state, with breadcrumbs
- →Redesigned dashboard with KPI cards, activity feed and quick project access
25 March 2026
NEW- →Mark defects directly on drawings with pins, and navigate defects from a drawing overview
- →Redesigned defect detail with inline notes, photo gallery with lightbox, assignments and audit trail
- →Advanced defect filtering by priority, location, assignee and date range
- →Generate PDF and CSV reports with filters, a progress indicator that survives navigation, and a report history
24 March 2026
NEW- →Full project management — create and edit projects with tabs, search, sort and archive
- →Build a location tree per project, with drag-and-drop and CSV import
- →New contractor directory with inline editing, contacts and CSV bulk-import
- →Add contractors to specific projects
22 March 2026
NEW- →Initial release — raise, track and assign site defects through their full lifecycle, with photos and audit history
- →Works offline — capture defects on site and sync automatically when back online, installable as an app
- →Drawing and document registers with versioning, plus RFIs and transmittals
- →Generate branded PDF and CSV reports, with a dashboard of project activity
- →Email and in-app notifications, and a tenant portal